When you see the towering cranes at the port, have you ever wondered how these "steel giants" crossed the ocean to the construction site? Today, we are going to reveal the wonderful journey of cranes from the factory to the installation site.
I. Disintegration and Division: The art of breaking down the whole into parts
The principle of modular decomposition
It is functionally divided into core modules such as the base, slewing mechanism, boom, counterweight, and cab
Typical split data:
An 80-ton crane can be decomposed into 15 to 20 transportation units
The maximum weight of a single piece is usually controlled within 40 tons (meeting the restrictions of road transportation).
Precision disassembly process
The disconnection sequence of electrical disconnection first and then mechanical disconnection
The key connection parts are marked with laser positioning
Professional sealing of hydraulic systems (to prevent oil leakage)
Ii. Packaging Protection: Put "protective clothing" on steel
Customized packaging solution
Precision components: Vacuum anti-rust packaging + wooden case
Structural components: Waterproof canvas + steel frame fixation
Vulnerable parts: Foam plastic + honeycomb cardboard buffer
Special treatment technology
Spray VCI vapor phase anti-rust agent on the metal surface
The electronic components are equipped with desiccants and humidity indicator cards
The moving parts adopt special fixed brackets
Iii. Loading and Transportation: A Relay Race by sea, land and air
Typical combination of multimodal transport
Factory area → Port: Hydraulic axle line vehicle (with a load capacity of up to 500 tons)
Transoceanic transportation: Specialized heavy crane vessels (equipped with 2,000-ton cranes)
Final mileage: Modular trailer group (flexible combination available)
Key loading technologies
The three-dimensional center of gravity calculation software ensures stability
Special twist lock fixing device (Wind and wave resistance grade 12)
Real-time GPS+ temperature and humidity monitoring system
Iv. On-site Revival: The Transformation from Parts to Giants
Professional assembly process
Basic acceptance → Main body hoisting → system connection → commissioning and testing
Typical assembly cycle: 7 to 15 days for medium and small-sized cranes
Precision guarantee measures
Laser alignment instrument (Installation accuracy ±0.1mm/m)
Vacuum oil injection technology for hydraulic systems
72-hour continuous load test
When the next crane passes by you, please remember the round-the-world journey it has experienced. Modern logistics technology enables these ten-thousand-ton steel giants to be safely dismantled and transported to all parts of the world just like Lego bricks.