Views: 0 Author: Site Editor Publish Time: 2025-04-02 Origin: Site
In modern logistics transportation and engineering construction, the balance between efficiency and cost has become the biggest problem. The traditional operation mode is time-consuming and labor-intensive, and the operating cost is greatly increased. It is urgent to make the equipment multi-functional and the operation process simple! The BOB-LIFT 16-ton truck-mounted crane emerged in response to this demand, completing a revolution in the operation mode.
Why 16 tons truck crane to become the new darling of the industry?
1. Pain points of traditional work
Complex scheduling: Cranes and trucks need to work together to increase waiting time
High cost: additional equipment rental + labor costs, an additional annual expenditure of 150,000-200,000
Limited space: the narrow space can not be deployed large lifting equipment
2. Advantages of truck crane
Multi-purpose: transportation and lifting are completed simultaneously, reducing intermediate links
Flexible and efficient: suitable for urban laneways, field sites and other scenarios
Cost optimization: a single device replaces multiple machines, and the comprehensive benefit is increased by 40%
Analysis of the core technology of 16 tons truck crane
1. Strong performance, stable and reliable
16 tons lifting capacity: covers most engineering needs and maximizes single lift efficiency
5-section telescopic arm design: the maximum arm length is 22 meters, suitable for high-altitude operation
Intelligent hydraulic system: precise control, hoisting error is less than ±2cm
2. Safety first, easy to operate
Multiple safety protection: overload protection, automatic balancing, emergency braking
270° operating Angle: no dead Angle monitoring, narrow space operation is safer
Remote control system: Support wireless operation from 50 meters away, reducing personnel risk
3. Strong adaptability, one car can do more
Modular design: can match a variety of truck chassis, quick modification
Multi-scenario application: logistics transportation, power installation, municipal engineering, emergency rescue
Industry application case
Case 1: Urban power transformation
Operation problem: the laneway in the old city is narrow, and large cranes cannot enter
Solution: 16 ton on-board crane + medium truck to complete the pole transport and erection in a single time
Advantages: The project duration is reduced by 35% and labor costs are reduced by 50%
Case 2: Port container transfer
Pain points: Traditional crane dispatch efficiency is low, container yard space is limited
Innovative solution: Direct loading with truck crane, reducing intermediate links
Benefits: Daily operation volume increased by 60%, turnaround time reduced by 40%
Service and support: From purchase to full lifecycle management
Customized solution: Match the chassis and crane configuration according to the requirements
Training services: Operator certification training to ensure safe and efficient use
Intelligent Wei-wei: Internet of Things remote monitoring, real-time warning equipment status
BOB-LIFT 16 tons truck monted crane with technological innovation, redefine the mode of operation, to help customers achieve the "less input, more output" operational goals. In the future, we will continue to develop intelligent and multi-functional equipment to provide more efficient solutions for the industry.